Chemtube® Peristaltic Pump System (PPS) Relieves Maintenance Headaches, Simplifies Lime Feed and Lowers Operating Costs at Water Treatment Plant
The 8 million gallons per day (MGD) Kingston, N.Y., Water Treatment Plant has been in operation for 103 years. Although a number of improvements have been made to the pressure filter facility over the years, it operates essentially as it was designed and today provides drinking water for 24,000 Kingston Water Department customers. Treatment consists of chlorine disinfection, direct-in-line filtration with alum coagulation and corrosion control through the addition of lime.
Read More