Peaker Signs 10-Year Service Contract With Siemens Water Technologies 

Water Technologies
  • English
X

Contact


search

  • Home
    • Product Groups
    • Market-specific Solutions
    • Investor Relations
    • Press
    • Jobs & Careers
    • Sustainability
    • About Us
    • Industry Sector
    • Energy Sector
    • Healthcare Sector
  • Market-specific Solutions
    • Automotive
    • Chemicals
    • Construction and Real Estate
    • Finance
    • Food&Beverage
    • Machine Building
    • Metals & Mining
    • Oil & Gas
    • Pharmaceuticals
    • Public Sector
    • Pulp & Paper
    • Tourism & Leisure
    • Transportaion & Logistics
    • Water
    • Wholesale / Retail
    • Cross Market Offerings
  • Water Technologies
    • Products
    • Services
    • Parts
    • Food and Beverage Industry
    • Life Sciences Industry
    • Marine Industry
    • Mining Industry
    • Oil and Gas Industry
    • Power Industry
    • Semiconductor and Solar Industry
    • Municipal
    • Aquatics and Leisure
    • Applications
    • About Us
    • Videos
    • Site Map
  • Applications
    • Aquatic Water Treatment
    • Corrosion and Biofouling Protection
    • Drinking Water Treatment
    • Groundwater Remediation
    • High Purity Water
    • Industrial Process Water
    • Odor and Vapor Control
    • Oil & Gas Produced Water
    • Sludge & Biosolids Treatment
    • Wastewater Treatment
    • Water Recycle & Reuse
    • Water and Wastewater Library
    • Find a Case Study
  • Industrial Process Water

Peaker Signs 10-Year Service Contract With Siemens Water Technologies

Challenge

In 2003, Siemens Water Technologies, formerly USFilter, received a call from the utility asking for help with RO membrane fouling problems.  Upon investigation, Siemens engineers found several issues to address:

  • Well water, previously thought to be free of contaminants, proved to have significant quantities of iron.
  • The water system was built without any pretreatment equipment to remove iron.
  • EDI polishers were producing off-spec water quality due to excess carbon dioxide in the RO permeate.
  • Excess capacity expansion in the electric utility caused a capital-spending freeze that precluded the customer from purchasing new equipment to solve system inadequacies.


Solution

Siemens installed a containerized, iron-removal system with six PreFlex® 54 automated multi-media filters to prevent membrane fouling.  Plumbing between the first and second-pass RO units was extended to increase reaction time for the inter-stage caustic and carbon dioxide, thereby preventing its passage through the RO membranes.  EDI performance improved and the final water quality consistently meets customer specification. 

The customer signed a 10-year service contract with Siemens that provides routing and preventative maintenance on the equipment.  The contract includes full operational responsibility for RO membranes, filters and expendables, as well as capital recovery for the filtration system over the life of the contract.

Results

Several benefits have resulted in this project.

  • RO membrane fouling problems eliminated.
  • Customer's life-cycle labor costs reduced.
  • The service contract assures regular on-site service and maintenance for the water system including immediate consultation for problem solving at a known and fixed cost.
  • Minimized unscheduled outages.
  • No capital expenditure to impact the customer's balance sheet.

 

top of page
Print
Contact Us
Technicians provide preventative maintenance services
Get help now
Contact

Related Products

PreFlex® Units

Sign up for our FREE newsletter.
First Name:
Email:
We respect your privacy and will never sell or rent our subscriber list.
© Siemens AG 2011 - Water Technologies
Corporate Information | Privacy Policy | Terms Of Use | Digital ID