Everybody Wins at Wisconsin's Ho-Chunk Casino 

Water Technologies
  • English
X

Contact


search

  • Water Technologies
    • Products
    • Services
    • Parts
    • Food and Beverage Industry
    • Life Sciences Industry
    • Marine Industry
    • Mining Industry
    • Oil and Gas Industry
    • Power Industry
    • Semiconductor and Solar Industry
    • Drinking Water Treatment
    • Municipal Wastewater Treatment
    • Aquatics and Leisure
    • Applications
    • About Us
    • Videos
    • Site Map
  • Applications
    • Aquatic Water Treatment
    • Corrosion and Biofouling Protection
    • Drinking Water Treatment
    • Groundwater Remediation
    • High Purity Water
    • Industrial Process Water
    • Odor and Vapor Control
    • Oil & Gas Produced Water
    • Sludge & Biosolids Treatment
    • Wastewater Treatment
    • Water Recycle & Reuse
    • Water and Wastewater Library
    • Find a Case Study
  • Wastewater Treatment

Everybody Wins at Wisconsin's Ho-Chunk Casino

Challenge

Due to the increase in tourism and the development of residential communities, the Ho-Chunk Nation Indian Tribe realized they would need to install a new wastewater treatment facility to meet future and current requirements.  Also, with the strength of waste almost three times above the norm for domestic waste streams the existing system was in jeopardy of failure.

Solution

With the need for nutrient removal and the requirement to handle widely varying biological loads, the OMNIFLO® Sequencing Batch Reactor (SBR) process was the logical choice.  Additionally, the OMNIFLO SBR process was a beneficial option because of its ability to be operated remotely via a computer SCADA system, thus reducing on-site staffing for operation. 

The design can handle a wide range of loadings, and achieve nitrification, denitrification and biological phosphorous removal.  This is critical in this application since the wastewater is high in BOD and total nitrogen.

The Ho-Chunk Nation agreed to the project contract based on the trust of the companies involved and the experience the suppliers had on previous project.

Results

The project moved from concept to completion in six months with start-up of the facility in March 1998.  Since then the facility was expanded which more than doubled their treatment capacity.

Average Designed Flow: 300,000 GPD
Average Actual Flow: 90,000 GPD

 

           BOD

          Nitrogen

 

 Influent
 mg/l

 Effluent
 mg/l

 Influent
mg/l (TKN)

 Effluent
 mg/l (TKN)

Design

  510

  50

  100

  10

Actual

  530

  16

  105

   9

Download pdf file of case study

top of page
Print
Contact Us
Ho-Chunk Nation Wastewater Treatment Facility
Get help now
Contact

Related Products

OMNIFLO Sequencing Batch Reactor

Sign up for our FREE newsletter.
First Name:
Email:
We respect your privacy and will never sell or rent our subscriber list.
© Siemens AG 2011 - Water Technologies
Corporate Information | Privacy Policy | Terms Of Use | Digital ID