Grey Eagle Casino Utilizes MBR System to Meet Advanced Wastewater Treatment Needs 

Grey Eagle Casino Utilizes MBR System to Meet Advanced Wastewater Treatment Needs 

Water Technologies
  • English
X

Contact


search

  • Home
    • Product Groups
    • Market-specific Solutions
    • Investor Relations
    • Press
    • Jobs & Careers
    • Sustainability
    • About Us
    • Industry Sector
    • Energy Sector
    • Healthcare Sector
  • Market-specific Solutions
    • Automotive
    • Chemicals
    • Construction and Real Estate
    • Finance
    • Food&Beverage
    • Machine Building
    • Metals & Mining
    • Oil & Gas
    • Pharmaceuticals
    • Public Sector
    • Pulp & Paper
    • Tourism & Leisure
    • Transportaion & Logistics
    • Water
    • Wholesale / Retail
    • Cross Market Offerings
  • Water Technologies
    • Products
    • Services
    • Parts
    • Food and Beverage Industry
    • Life Sciences Industry
    • Marine Industry
    • Mining Industry
    • Oil and Gas Industry
    • Power Industry
    • Semiconductor and Solar Industry
    • Drinking Water Treatment
    • Municipal Wastewater Treatment
    • Aquatics and Leisure
    • Applications
    • About Us
    • Videos
    • Site Map
  • Applications
    • Aquatic Water Treatment
    • Corrosion and Biofouling Protection
    • Drinking Water Treatment
    • Groundwater Remediation
    • High Purity Water
    • Industrial Process Water
    • Odor and Vapor Control
    • Oil & Gas Produced Water
    • Sludge & Biosolids Treatment
    • Wastewater Treatment
    • Water Recycle & Reuse
    • Water and Wastewater Library
    • Find a Case Study
  • Wastewater Treatment
    • Alkaline Cleaner Recovery
    • Archimedes / Screw Pumping
    • Biological Treatment
    • BOD & COD Reduction
    • Chemical Feed and Control
    • Clarification and Sedimentation
    • Disinfection
    • Dissolved Metals Removal
    • Hazardous Waste Treatment
    • Hexavalent Chrome Removal
    • Nutrient Removal
    • Oil and Water Separation
    • Primary Treatment
    • Secondary Treatment
    • Spent Caustic Treatment
    • Tertiary Treatment
    • TOC Reduction
    • Water Quality Analyzers and Process Control
  • Biological Treatment

Grey Eagle Casino Utilizes MBR System to Meet Advanced Wastewater Treatment Needs

Challenge

The Grey Eagle Casino was a new commercial venture by the Tsuu T’ina Nation, in partnership with Sonco Gaming (Alberta) Ltd. This casino and future hotel/entertainment project is located on Tsuu T’ina lands in southwest Calgary.  The location had no water and sewer services, and had tight standards for discharging the wastewater that ultimately goes into Pine Creek. Any discharge at this location required advanced treatment, including a highly filtered effluent, with nitrogen removal to levels below 10 mg/L total nitrogen, and phosphorus removal to levels less than 0.5 mg/L.

In addition to advanced treatment, the site layout required a compact system that would allow both the wastewater treatment and water treatment systems to be housed in the same building.  The close proximity of the equipment to the casino made stringent odour control necessary. A very tight project schedule, as well as the short supply of
construction labour during a period of heavy oilfield development, created a preference for a simple, prefabricated system that could be installed quickly and inexpensively.

Solution

After looking at several options, Sonco Gaming’s engineer selected the Xpress MBR package plant. With an estimated average flow rate of 200,000 L/day, this plant addressed all of the casino’s specified needs. The advanced treatment unit easily met the casino’s stringent effluent requirements. The system was designed with a completely enclosed biological reactor and covered membrane tanks. A simple carbon adsorption odour control system ensured nuisance-free operation. 

The compressed schedule meant that the building for the water and wastewater equipment had to be constructed well before equipment delivery. When the MBR skid arrived, it was conveniently lifted through removable roof panels, set in place, and quickly installed.

Results

The complete wastewater system includes an in-ground equalization and sludge storage basin, lift pumps, and MBR package system (fine-screen, anoxic and aerobic biological treatment reactors, and a two-cell membrane system followed by disinfection). Effluent is discharged to a subsurface disposal system and ultimately drains into Pine Creek. The system has been meeting all discharge requirements since it became operational in October 2007.

Download Entire Case Study

top of page
Print
Contact Us
Cannibal System
Get help now
Contact

Related Products and Services

XPress™ MBR Package Plant
Membrane Biological Reactor Systems (MBR)
Biological Wastewater Treatment Products

Sign up for our FREE newsletter.
First Name:
Email:
We respect your privacy and will never sell or rent our subscriber list.
© Siemens AG 2011 - Water Technologies
Corporate Information | Privacy Policy | Terms Of Use | Digital ID