Eraring Power Station Saves Money With Water Reclamation
Australia's Eraring Power Station, owned by Eraring Energy, needed to treat secondary sewage from the nearby Dora Creek municipal wastewater plant for recycle as high-quality boiler feedwater. The power plant was sharing potable water with 25,000 homes, resulting in an intermittent supply. Secondary sewage needed to be piped 10 miles (17 kilometers) to a sea outfall.
Read More